PENERAPAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) PADA PERENCANAAN INTERVAL PREVENTIVE MAINTENANCE DAN ESTIMASI BIAYA PEMELIHARAAN MENGGUNAKAN ANALISIS FMECA ( STUDI KASUS : PT. XYZ )
DOI:
https://doi.org/10.22441/pasti.2019.v13i3.007Keywords:
Maintenance, Failure Mode Effect and Critical Analysis, Reliability Centered Maintenance, Maintenance task, Maintenance costAbstract
PT. XYZ merupakan perusahaan yang bergerak dibidang produksi spare part dan aksesoris otomotif khusunya sepeda motor. Permasalahan yang dihadapi perusahaan yaitu sering terjadinya kerusakan pada mesin CNC Milling A dengan jumlah kerusakan 32 kali selama tahun 2017 hingga 2018. Perusahaan menerapkan kegiatan preventive maintenance dan corrective maintenance namun kegiatan maintenance ini tidak berjalan dengan optimal. Oleh karena itu, dilakukan pengembangan sistem pemeliharaan untuk meningkatkan keandalan mesin. Metode yang digunakan yaitu Reliability Centered Maintenance (RCM) dengan tujuan menentukan interval waktu pemeliharaan dan estimasi biaya pemeliharaan yang efisien. RCM dilakukan dengan menganalisis kegagalan dengan analisis FMECA. Hasil dari analisis ini berupa nilai RPN yang menunjukkan komponen bearing rel, bearing spindle dan selang sebagai komponen kritis pada sistem. Kemudian ditentukan kebijakan maintenance dengan hasil 2 scheduled on-condition task, 2 scheduled restoration dan 2 scheduled discard task dengan interval waktu maintenance sesuai dengan kategori task. Melalui metode RCM, PT.XYZ dapat menghemat biaya pemeliharaan sebesar Rp. 51.800.331Downloads
Downloads
Published
How to Cite
Issue
Section
License
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.









