Abstract


The capacity planning serves an important role in strategic decisions involving production facilities. While there are many publications made on capacity planning, most of the models created tend to restrict their applications in real-world due to some initial assumptions being made and/or the run-time execution of the models that may be prohibitive. The objective of this paper is to explore the model construction for in-plant truck movement in a cement company that is based on building a discrete-event simulation one so that the planning may be sufficiently robust while the amount of time for constructing the model and the run-time still serve practical purposes. The model then is used to examine the effects of shifting bottlenecking and thus, allows users to identify critical resources for the production process. The results show that such a model provides the directions and aids for the management to make the strategic decisions.


Keywords


capacity planning; discrete-event simulation; in-plant truck movement; shifting bottleneck; critical resources

Full Text:

PDF

References


Ahmed, S., & Sahinidis, N. (2003). An Approximation Scheme for Stochastic Integer Programs Arising in Capacity Expansion. Operations Research, 51(3), 461-471.

Ahmed, S., King, A., & Parija, G. (2003). A Multi-stage Stochastic Integer Programming Approach for Capacity Expansion Under Uncertainty. Journal of Global Optimization, 26, 3-24.

Asbach, L., Dorndorf, U., & Pesch, E. (2009). Analysis, modeling and solution of the concrete delivery problem. European Journal of Operational Research, 193(3), 820-835.

Banks, J., Carson, J. S., Nelson, B. L., & Nicol, D. M. (2013). Discrete-Event System Simulation. New York: Pearson.

Biller, B., Hartig, M., Olson, R. J., Trant, G., Sui, Y., & Minnick, A. (2019). General Electric Uses Simulation and Risk Analysis for Silicon Carbide Production System Design. INFORMS Journal on Applied Analytics, 49(2), 117-128.

Bodon, P., Fricke, C., Sandeman, T., & Stanford, C. (2011). Modeling the mining supply chain from mine to port: A combined optimization and simulation approach. Journal of Mining Science, 47(2), 202-211.

Bouffard, S. C., Boggis, P., Pereira, M., Quan, K., & Fleming, S. (2018). Discrete-event simulation modeling unlocks value for the Jansen Potash Project. INFORMS Journal on Applied Analytics, 48(1), 45-56.

Brown, G., Keegan, J., Vigus, B., & Wood, K. (2001). The Kellogg Company optimizes production, inventory, and distribution. Interfaces, 31(6), 1-15.

Cakanyildirim, M., Roundy, R., & Wood, S. (2004). Optimal Machine Capacity Expansions with Nested Limitations Stochastic Demand Forecast Accuracy Model. Naval Research Logistics, 51, 217-241.

Chen, J., Chen, L., & Leu, D. (2006). Developing optimization models for cross-functional decision making: Integrating marketing and production planning. OR Spectrum, 28(2), 223-240.

Chou, Y.-C., Cheng, C.-T., Yang, F.-C., & Liang, Y.-Y. (2007). Evauating Alternative Capacity Strategies in Semiconductor Manufacturing under Uncertain Demand and Price Scenarios. International Journal of Production Economics, 105(2), 591-606.

Dikos, G., & Spyropoulou, S. (2013). Supply chain optimization and planning in Heracles general cement company. Interfaces, 43(4), 297-312.

Everett, J. E., Howard, T. J., & Jupp, K. (2010). Simulation modelling of grade variability for iron ore mining, crushing, stockpiling and ship loading operations. Mining Technology, 119(1), 22-30.

Fowler, J. W., Monch, L., & Ponsigmon, T. (2015). Discrete-event simulation for semiconductor wafer fabrication facilities: A tutorial. International Journal of Industrial Engineering Theory & Practice, 22(5), 661-682.

Geng, N., & Jiang, Z. (2009). A Review on Strategic Capacity Planning for the Semiconductor Manufacturing Industry. International Journal of Production Research, 47(13), 3639-3655.

Groeneveld, B., & Topal, E. (2011). Flexible open-pit mine design under uncertainty. Journal of Mining Science, 47(2), 212-226.

Hammesfahr, R. J., Pope, J. A., & Ardalan, A. (1993). Strategic Planning for Production Capacity. International Journal of Operations & Production Management, 13(5).

Hoffman, K., & Durbin, M. (2008). The dance of the thirty ton trucks. Operations Research, 56(1), 3-19.

March, J. G., & Simon, H. A. (1958). Organizations. New York: John Wiley.

Matsatsinis, N. F. (2004). Towards a decision support system for the ready concrete distribution system: A case of a Greek company. European Journal of Operational Research, 152(2), 487-499.

Meng, C., Nageshwaraniyer, S. S., Maghsoudi, A., & Dessureault, S. (2013). Data-driven modelling and simulation framework for material handling systems in coal mines. Computers & Industrial Engineering, 64(3), 766-779.

Mutagwaba, W. K., & Hudson, J. A. (1993). Use of object-orientated simulation model to assess operating and equipment options for underground mine transport system. Mining Technology IMM Transportation Section A, 102, 89-94.

Naso, D., Suricom, M., & Turchiano, B. (2007). Reactive scheduling of a distributed network for the supply of perishable products. IEEE Transactions on Automation Science and Engineering, 4(3), 407-423.

Pereira, S. P., Costa, J. F., Salvadoretti, P., & Koppe, J. (2012). Mining simulation for room and pillar coal operation. Journal of Southern African Institute of MIning Metallurgy, 112(6), 473-476.

Sabour, S. A., Dimitrakopoulos, R. G., & Kumral, M. (2013). Mine design selection under uncertainty. Mining Technology, 117(2), 53-66.

Salama, A., Greberg, J., & Schunnesson, H. (2014). The use of discrete event simulation for underground haulage mining equipment selection. International Journal of Mining Mineral Engineering, 5(3), 256-271.

Sargent, R. G. (2007). Verification and Validation of Simulation Models. In S. G. Henderson, B. Biller, M. H. Hsieh, J. Shortle, J. D. Tew, & R. R. Barton (Ed.), Proceedings of the 2007 Winter Simulation Conference, (pp. 124-137). Washington, D.C.

Schmid, V., Doerner, K. F., Hartl, R. F., Savelsbergh, M. W., & Stoecher, W. (2009). A hybrid solution approach for ready-mixed concrete delivery. Transportation Science, 43(1), 70-85.

Tenhiala, A. (2011, 1-2). Contingency Theory of Capacity Planning: The Link between Process Types and Planning Methods. Journal of Operations Management, 29, 65-77. doi:10.1016/j.jom.2010.05.003

Tommelein, I. D., & Li, A. (1999). Just-in-time concrete delivery: Mapping alternatives for vertical supply chain integration. Proceeding of Seventh Annual Conference (pp. 97-108). University of California, Berkeley: International Group for Lean Construction IGLC-7.

Woods, S. C. (2007). Factory modeling. In R. Doering, & Y. Nishi (Eds.), Handbook of Semiconductor Manufacturing Technology (pp. 1-23). Boca Raton, FL: CRC Press.




DOI: http://dx.doi.org/10.22441/pasti.2020.v14i2.005

Refbacks

  • There are currently no refbacks.


Jurnal PASTI (Penelitian dan Aplikasi Sistem dan Teknik Industri)
Teknik Industri, Fakultas Teknik, Universitas Mercu Buana
Jl. Meruya Selatan, Kembangan, Jakarta Barat 11650
Tlp./Fax: +62215871335
p-ISSN: 2085-5869 / e-ISSN: 2598-4853
http://journal.mercubuana.ac.id/index.php/pasti/

 

This journal is accredited:

This journal is indexed by:

     

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Web
Analytics Made Easy - StatCounter
View My Stats