ANALISA KINERJA BIAYA DAN WAKTU PADA PELAKSANAAN PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE (STUDI KASUS PROYEK KONSTRUKSI MALL DAN HOTEL X DI PEKANBARU)
Kata Kunci:
Kinerja waktu dan biaya, Earned ValueAbstrak
Proyek pembangunan Mall dan Hotel X Pekanbaru harus diselesaikan sesuai target yang di rencanakan. Dengan
adanya batasan waktu dan biaya diperlukan pengendalian yang baik. Akan tetapi sebelum dilakukan pengendalian perlu diketahui terlebih dahulu kinerja proyek yang telah berlangsung. Tujuan penelitian ini adalah agar memperoleh mengetahui kinerja biaya dan waktu, estimasi biaya dan waktu pada akhir penyelesaian proyek serta faktor-faktor yang menyebabkan keterlambatan atau kemajuan proyek. Penelitian ini menggunakan metode pengendalian yaitu earned value yang didalamnya memadukan unsur biaya dan waktu serta fisik pekerjaan. Data yang di dapat dari proyek antara lain, time schedule. Rencana Anggaran Biaya (RAB), Laporan Mingguan Proyek dan Biaya Aktual. Kemudian dilakukan analisa biaya, jadwal, varian terpadu dan indeks performasi dengan memaparkan masalah-masalah yang muncul pada saat penelitian. Pelaksana proyek pembangunan mall dan hotel x pekanbaru dikerjakan oleh PT. Waskita Karya cabang Riau, dengan waktu rencana pekerjaan adalah 427 hari dan mengalami perpanjang waktu selama 105 hari sehingga waktu penyelesaian proyek menjadi 532 hari kalender dengan nilai kontrak Rp. 167.200.000.000,- termasuk Ppn. Lingkup pekerjaan yang dikerjakan oleh kontraktor adalah pekerjaan struktur, arsitektur dan plumbing.
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that this paper has not been published in the same form elsewhere.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above-mentioned paper as a whole to UMB. The copyright transfer covers the right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.
Our Articles are licensed under CC BY-NC

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.