Reducing dandori processing time using the single minute exchange of die method in swaging areas in automotive rubber components company
DOI:
https://doi.org/10.22441/oe.2023.v15.i2.079Kata Kunci:
automotive component, dandori, SMED, set-upAbstrak
The automotive component company is engaged in the manufacture of automotive rubber components. Based on data obtained from field observations, it was found that the Dandori process on the swaging Nox machine, especially TA090 type, had the highest downtime compared to another component. Based on these problems, research uses the Single Minute Exchange of Die (SMED) method to reduce Dandori downtime in the TA090 swaging process. The SMED method was carried out in three stages: 1. identify internal and external setup, 2. Converting internal to external setup, and 3. Streamlining aspects of operation. In addition, it also used data processing tools, namely SMART, fishbone, and 5W+1H as support to solve this problem. Improvements were made by converting internal work elements into external ones and streamlining aspects of operation by improving on man, method, and machine/tools categories. The result of these improvements was a decrease in downtime of 39 minutes 48 seconds and the improvement efficiency achieved was 81.2%.Unduhan
Referensi
Arifin, D. (2018). Analisis Perbaikan Waktu Setup Dengan Menggunakan Metode SMED Untuk Meningkatkan Produktivitas PT. Trimitra Chitra Hasta. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri., 1(1), 1–14. https://doi.org/10.37721/kalibrasi.v8i0.313
Azwir, H. H., Wijaya, N. C., & Oemar, H. (2021). Implementasi Metode Single Minute Exchange Of Die Untuk Mengurangi Waktu Persiapan dan Penyesuaian Mold di Industri Polimer. JISI: Jurnal Integrasi Sistem Industri, 8(2), 41. https://doi.org/10.24853/jisi.8.2.41-52
Fathia, R. N., Batubara, S., & Safitri, D. M. (2016). Usulan Pengurangan Waktu Setup Menggunakan Metode SMED Serta Pengurangan Waktu Proses Produksi dan Perakitan Menggunakan Metode MOST di PT. Panasonic Manufacturing Indonesia. Jurnal Teknik Industri, 6(2), 187–196. https://doi.org/10.25105/jti.v6i2.1543
Hien N. Nguyen, & Nhan H. Huynh. (2019). Optimizing equipment efficiency: An application of SMED methodology for SMEs. The Journal of Agriculture and Development, 18(3), 1–9. https://doi.org/10.52997/jad.1.03.2019
Ibrahim, I., Arifin, D., & Khairunnisa, A. (2020). Analisis Pengendalian Kualitas Menggunakan Metode Six Sigma Dengan Tahapan DMAIC Untuk Mengurangi Jumlah Cacat Pada Produk Vibrating Roller Compactor Di PT. Sakai Indonesia. Jurnal KaLIBRASI - Karya Lintas Ilmu Bidang Rekayasa Arsitektur, Sipil, Industri., 3(1), 18–36. https://doi.org/10.37721/kal.v3i1.639
Ikatrinasari, Z. F., Hasibuan, S., & Kosasih, K. (2018). The Implementation Lean and Green Manufacturing through Sustainable Value Stream Mapping. International Conference on Design, Engineering and Computer Sciences, 453(1), 1–9. https://doi.org/10.1088/1757-899X/453/1/012004
Nurrizky, M. F., Septiana, M. A., Machmudin, J., & Syafii, M. (2021). Peningkatan Efisiensi Mesin Cnc Turning Menggunakan Metode Single Minutes Exchange of Dies di PT.X. Jurnal Ilmiah Teknologi Infomasi Terapan, 7(2), 94–100. https://doi.org/10.33197/jitter.vol7.iss2.2021.526
Pratama, W., Yanuar, A. A., & Rendra, M. (2019). Proposed Improvement To Minimize Motion Waste in Production of Head Casing Part at PT. Multi Instrumensi With Lean Manufacturing Approach. Quantum Teknika : Jurnal Teknik Mesin Terapan, 1(1), 33–38. https://doi.org/10.18196/jqt.010106
Runtuk, J. K., & Sembiring, N. (2021). Set Up Time Reduction Using Single Minute Exchange of Dies (SMED) and 5S: A Case Study. JIE Scientific Journal on Research and Application of Industrial System, 6(2), 162. https://doi.org/10.33021/jie.v6i2.3384
Sahin, R., & Kologlu, A. (2022). A Case Study on Reducing Setup Time Using SMED on a Turning Line. Gazi University Journal of Science, 35(1), 60–71. https://doi.org/10.35378/gujs.735969
Setiawan, L., & Hasibuan, S. (2021). Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing. Quality Innovation Prosperity, 25(2), 19–36. https://doi.org/10.12776/qip.v25i2.1516
Setyawan, L. (2019). Increasing the production capacity of copper drawing machine in the cable industry using SMED method: A case study in Indonesia. Operations Excellence: Journal of Applied Industrial Engineering, 11(3), 217. https://doi.org/10.22441/oe.v11.3.2019.031
Silva, A., Sá, J. C., Santos, G., Silva, F. J. G., Ferreira, L. P., & Pereira, M. T. (2021). A comparison of the application of the smed methodology in two different cutting lines. Quality Innovation Prosperity, 25(1), 124–149. https://doi.org/10.12776/QIP.V25I1.1446
Sousa, E., Silva, F. J. G., Ferreira, L. P., Pereira, M. T., Gouveia, R., & Silva, R. P. (2018). Applying SMED methodology in cork stoppers production. Procedia Manufacturing, 17, 611–622. https://doi.org/10.1016/j.promfg.2018.10.103
Supriyati, Wiyatno, T. N., & Darmawan, H. (2021). Increase of plastic injection production using Overall Equipment Effectiveness and Single Minute Exchange of Dies Analysis. Operations Excellence: Journal of Applied Industrial Engineering, 2021(3), 394–406. https://doi.org/10.22441/oe.2021.v13.i3.036
Suryaprakash, M., Gomathi Prabha, M., Yuvaraja, M., & Rishi Revanth, R. V. (2020). Improvement of overall equipment effectiveness of machining centre using tpm. Materials Today: Proceedings, 46(19), 9348–9353. https://doi.org/10.1016/j.matpr.2020.02.820
Talekar, Patil, Shinde, Waghmare. (2019). Setup Time Reduction using Single Minute Exchange of Dies (SMED) at a Forging Line. 1st International Conference on Manufacturing, Material Science and Engineering (ICMMSE-2019)AIP Conf. Proc. 2200, 020018-1–020018-6; https://doi.org/10.1063/1.5141188
Unduhan
Diterbitkan
Cara Mengutip
Terbitan
Bagian
Lisensi
The copyright to this article is transferred to Universitas Mercu Buana (UMB) if and when the article is accepted for publication. The undersigned hereby transfers any and all rights in and to the paper including without limitation all copyrights to UMB. The undersigned hereby represents and warrants that the paper is original and that he/she is the author of the paper, except for material that is clearly identified as to its original source, with permission notices from the copyright owners where required. The undersigned represents that he/she has the power and authority to make and execute this assignment.
We declare that:
1. This paper has not been published in the same form elsewhere.
2. It will not be submitted anywhere else for publication prior to acceptance/rejection by this Journal.
3. A copyright permission is obtained for materials published elsewhere and which require this permission for reproduction.
Furthermore, I/We hereby transfer the unlimited rights of publication of the above mentioned paper in whole to UMB. The copyright transfer covers the exclusive right to reproduce and distribute the article, including reprints, translations, photographic reproductions, microform, electronic form (offline, online) or any other reproductions of similar nature.
The corresponding author signs for and accepts responsibility for releasing this material on behalf of any and all co-authors. This agreement is to be signed by at least one of the authors who have obtained the assent of the co-author(s) where applicable. After submission of this agreement signed by the corresponding author, changes of authorship or in the order of the authors listed will not be accepted.
Retained Rights/Terms and Conditions
1. Authors retain all proprietary rights in any process, procedure, or article of manufacture described in the Work.
2. Authors may reproduce or authorize others to reproduce the Work or derivative works for the authors personal use or for company use, provided that the source and the UMB copyright notice are indicated, the copies are not used in any way that implies UMB endorsement of a product or service of any employer, and the copies themselves are not offered for sale.
3. Although authors are permitted to re-use all or portions of the Work in other works, this does not include granting third-party requests for reprinting, republishing, or other types of re-use.