Analysis of Lean Process Factors to Improve Production Process Effectiveness (Case Study in BFM Pharmaceutical Industry)

Oom Oman Abdurrahman, Vita Sarasi, Iman Chaerudin, Ina Primiana, Akhmad Yunani

Abstract


BFM is a pharmaceutical company that produces bulk Tetanus Toxoid (TT). Bulk TT demand will continue to increase until 2025, while the current utilization rate has reached 97% of its design capacity. Bulk TT's current production capacity is insufficient, while the building area cannot be enlarged. This research was conducted to improve non-necessary value added by identifying and reducing waste to run well even though the production capacity is limited. Mix descriptive qualitative and quantitative methods are applied in this research. Production simulation is undertaken to reduce waste through the Gemba Kaizen approach and Kanban, while production capacity simulation is carried out using Dynamic Systems. The results of the simulations are described in the Balanced Scorecard. The research revealed there are 148 wastes consisting of 4 causes of waste in the high priority category, 20 medium priority and 124 low priority. The simulation generates a significant decrease value of the waste priority number (WPN) from 347.3 to 47.2. There was also an increase in the overall value stream. Value-added ratio (VAR) increased 12.57%, production lead time reduced 21.01%, and total cycle time decreased 11.65%. These findings indicated that the improvement was effective in eliminating waste. From the overall improvement, there was an increase in productivity of 25.0%.

Keywords


lean continuous improvement; waste priority number; value added ration; dynamic system

Full Text:

PDF

References


Achmadi, F., Harsanto, B., & Yunani, A. (2021). Analisis cycle time proses perakitan senjata di PT. Pindad (Persero). Operations Excellence: Journal of Applied Industrial Engineering, 13(2), 159–168. https://doi.org/10.22441/oe.2021.v13.i2.015

Creswell, J. W. (2014). Research Design Qualitative, Quantitative, and Mixed Methods Approaches. SAGE Publication Inc. https://books.google.co.id/books?id=4uB76IC_pOQC& printsec=copyright&hl=id#v=onepage&q&f=false

Gaspersz, V. (2002). Pedoman Impementasi Program Six Sigma (1st ed.). PT. Gramedia Pustaka Utama.

Hartanti, R. S., & Singgih, M. L. (2020). Management of redpack shipping logistics services to reduce waste: PT. PELNI case study). Operations Excellence: Journal of Applied Industrial Engineering, 12(3), 283–296. https://doi.org/10.22441/oe.2020.v12.i3.002

Haviana, E., & Hernadewita, H. (2019). Productivity improvement in the rubber production process using value stream mapping method to eliminate waste. Operations Excellence: Journal of Applied Industrial Engineering, 11(2), 119–130. https://doi.org/10.22441/oe.v11.2.2019.023

Henrique, D. B., Filho, M. G., Marodin, G., Jabbour, A. B. L. de S., & Chiappetta Jabbour, C. J. (2021). A framework to assess sustaining continuous improvement in lean healthcare. International Journal of Production Research, 59(10), 2885–2904. https://doi.org/10.1080/00207543.2020.1743892

Holtskog, H. (2013). Continuous improvement beyond the lean understanding. Procedia CIRP, 7, 575–579. https://doi.org/10.1016/j.procir.2013.06.035

Kholil, M., Hendri, Hanum, B., & Setiawan, R. (2018). Using 7 waste approach and VSM method to improve the efficiency of mackerel fish crackers production time at small medium enterprise (SME). Proceedings of the International Conference on Industrial Engineering and Operations Management, 2018-March, 2819–2826.

Marendra, I. (2018). Upaya Miminimasi Waste Pada Lini Proses Produksi Kertas Memo Putar Menggunakan Value Stream Mapping (VSM). Operations Excellence: Journal of Applied Industrial Engineering, 10(1), 17-25.

Nandakumar, N., Saleeshya, P. G., & Harikumar, P. (2020). Bottleneck Identification And Process Improvement By Lean Six Sigma DMAIC Methodology. Materials Today: Proceedings, 24, 1217–1224. https://doi.org/10.1016/j.matpr.2020.04.436

Rahman, N. A. A., Sharif, S. M., & Esa, M. M. (2013). Lean Manufacturing Case Study with Kanban System Implementation. Procedia Economics and Finance, 7, 174–180. https://doi.org/10.1016/s2212-5671(13)00232-3

Sarasi, V., & Chaerudin, I. (2021). Manajemen Proyek Ekselen : Tepat Biaya, Tepat Waktu, Tepat Mutu (1st ed.). Bintang Pustaka Madani.

Sarasi, V., Primiana, I., Masyita, D., & Yunizar. (2019). Model of Optimal Zakat Allocation by Using Data Envelopment Analysis Approach. International Conference of Zakat, 87–97.

Sarasi, V., Yulianti, D., & Farras, J. I. (2021). Pengantar Berpikir Sistem Dan Dinamika Sistem. In Purnama (Ed.), Paper Knowledge . Toward a Media History of Documents (Pertama, Vol. 5, Issue 2). Yayasan Sahabat Allam Rafflesia.

Setiawan, L., & Hasibuan, S. (2021). Improve Ramp-Up Performance on the Sewing Process in a Sports Shoe Factory Using 8-Disciplines and Lean Manufacturing. Quality Innovation Prosperity, 25(2), 19-36.

Setiawan, I., Tumanggor, O., & Purba, H. H. (2021). Value Stream Mapping: Literature Review and Implications for Service Industry. Jurnal Sistem Teknik Industri, 23(2), 155–166. https://doi.org/10.32734/jsti.v23i2.6038




DOI: http://dx.doi.org/10.22441/oe.2022.v14.i1.045

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Operations Excellence: Journal of Applied Industrial Engineering

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Journal ISSN:

Portal ISSNPrint ISSN: 2085-4293
Online ISSN: 2654-5799

Tim Editorial Office
Operations Excellence: Journal of Applied Industrial Engineering

Magister Teknik Industri Universitas Mercu Buana
Jl. Raya Meruya Selatan No. 1 Kembangan Jakarta Barat
Email: [[email protected]]
Website: http://publikasi.mercubuana.ac.id/index.php/oe
Journal DOI: 10.22441/oe

The Journal is Indexed and Journal List Title by: