Analysis of project work using earned value management and precedence diagram method in manufacturing system projects

Dizsa Arliansyah Nugroho, Tedjo Sukmono, Ribangun Bamban Jakaria

Abstract


PT. Weiss Tech has received a project order for the fabrication and installation of coffee packaging production machines from PT.XYZ, scheduled to start on June 19, 2023, with a deadline of June 24, 2024, spanning 54 weeks. The project has been ongoing for 16 weeks with an update indicating that only 20% of the planned progress has been achieved, which suggests that it may not be completed on time. To evaluate the project's performance, the EVM  method will be used to identify critical tasks and reduce the project duration using the Precedence Diagram Method with the help of MS Project software. The evaluation shows negative values for CV and SV variances, as well as performance index SPI<1 and CPI<1, indicating poor project performance. The critical tasks identified include electrical & instrument installation, machine & utility installation, trial work, assembly, quality control, polishing, milling, turning, cutting, and design. Design work has been identified as the most influential on the critical path. By rescheduling the project plan, positive values for CV and SV have been achieved. With the SPI value of 1.13 and CPI value of 1, it can be concluded that future project performance will be completed faster and within budget.


Keywords


earn value management; precedence diagram method; MS Project

Full Text:

PDF

References


Ahadis, M. I. H., Haryono, I., & Puspita, I. A. (2020). Pengukuran Kinerja Waktu Proyek Menggunakan

Metode Earned Value Management (EVM) Dan Mengoptimalkan Waktu Proyek Menggunakan Precedence Diagramming Method (PDM) Pada Proyek Renovasi Ruangan PT. XYZ. E-Proceeding of Engineering, 7(2), 5521–5528.

Caintan, M., & Suwarno. (2022). Computer Based Information System Journal Perancangan dan

Pengembangan Aplikasi Pendukung Proses Manufaktur dalam Penyusunan Palet Menggunakan Metodologi Prototyping. CBIS JOURNAL, 10(01). http://ejournal.upbatam.ac.id/index.php/cbishttp://ejournal.upbatam.ac.id/index.php/cbis

Dinata, G., Muttaqin, A., & Darsin, M. (2020). RANCANG BANGUN DAN UJI PERFORMASISTEM

KENDALI PEMBERIAN FLUIDA PERMESINAN MQL BERBASIS ARDUINO. REKAYASA MESIN, 11, 97–104.

Farrel Ghiffary, M., Abdul Mukti, F., Zulfa Geofani Firdaus, A., Nugroho Sulistyantoro, T., & Farrel

Ghiffary Muhammadfarrelghiffary, M. (2023). Analisis progres realisasi proyek terhadap biaya pada proyek jembatan kereta api rangka baja Surakarta. Proceeding Civil Engineering Research Forum, 3, 63–71.

Nabil, R., Furuhitho, X., Setiawan, L., Susanto, R., & Slameto, P. (2023). Perencanaan Pengendalian Biaya dan Waktu pada Proyek Pembangunan Rumah Susun Stie Tazkia Cendikia Bogor dengan Metode Earned Value. Journal Of Social Science Research, 3, 7591–7600.

Ginting, E. S., Charin, D., & Tarigan, N. (2023). Penjadwalan Produksi Celana Katun Menggunakan Metode Heuristic Pour. EE Conference Series, 178–181. https://doi.org/10.32734/ee.v6i1.1802

Luntungan, C., Arsjad, T. T., & Mangare, J. B. (2023). Analisis Penjadwalan Proyek Dengan Metode Precedence Diagram Method (PDM) Menggunakan Konsep Cadangan Waktu Pada Proyek Pembangunan Jembatan Sosongian Minahasa Selatan. Tekno, 21(85), 1690–1698.

Mantovani, M. R., & Beatrix, M. (n.d.). EVALUASI PENGENDALIAN BIAYA DENGAN METODE CRITICAL PATH METHOD (CPM) MENGGUNAKAN MICROSOFT PROJECT (STUDI KASUS: PEKERJAAN TAHAP VII PROYEK PERKUATAN STRUKTUR DERMAGA BERLIAN TANJUNG PERAK SURABAYA). Jurnal Ilmiah Teknik Dan Manajemen Industri, 3(1), 2023–2721. https://doi.org/10.46306/tgc.v3i1

Nalawade, S., Ghode, O., & Vaidya, P. (2019). Earn value analysis of construction project using primavera p6. CIKITUSI JOURNAL FOR MULTIDISCIPLINARY RESEARCH, 6(5), 514–522. http://cikitusi.com/

Proboretno, W., Witjaksana, B., & Tjendani, H. T. (2024). ANALYSIS OF COST AND TIME PERFORMANCE IN THE WADUNGASRI MARKET CHANNEL NORMALIZATION WORK IN SIDOARJO USING THE EARNED VALUE METHOD. INTERNATIONAL JOURNAL ON ADVANCED TECHNOLOGY, 3(2). https://ojs.transpublika.com/index.php/IJATEIS/

Project Management Institute, & Agile Alliance. (2017). A guide to the project management body of knowledge (PMBOK guide).

Reski Meliya, K., Purnama Sari, D., Arrie Rafshanjani, M., & Artikel, H. (2022). ETNIK : Jurnal Ekonomi-Teknik Evaluasi Pelaksanaan Pembangunan Proyek Dengan Menggunakan Metode Earnede Value Informasi Artikel. Ekonomi Teknik, 1, 374–382.

Supardi, S., Ahmadsyah, A., Urip Sumoharjo Km, J., Panakkukang, K., Makassar, K., & Selatan, S. (2021). Tinjauan Waktu Pelaksanaan Proyek Menggunakan Microsoft Project 2021 pada Pembangunan Pesantren Entrepeneurship Kabupaten Lebak Provinsi Banten. Teknik Sipil, 8, 159–169.

Veronika, J., & Ginting, B. (2020). Metode Earned Value Pada Pengendalian Proyek Pembangunan Gedung Sekolah SD Methodist-an Pancur Batu. Journal of Economics and Accounting, 1, 6–10.




DOI: http://dx.doi.org/10.22441/oe.2024.v16.i2.114

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Operations Excellence: Journal of Applied Industrial Engineering

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Journal ISSN:

Portal ISSNPrint ISSN: 2085-4293
Online ISSN: 2654-5799

Tim Editorial Office
Operations Excellence: Journal of Applied Industrial Engineering

Magister Teknik Industri Universitas Mercu Buana
Jl. Raya Meruya Selatan No. 1 Kembangan Jakarta Barat
Email: [[email protected]]
Website: http://publikasi.mercubuana.ac.id/index.php/oe
Journal DOI: 10.22441/oe

The Journal is Indexed and Journal List Title by:

                 

 

 

Operations Excellence: Journal of Applied Industrial Engineering is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.